Nynja Build Manual 1.4d
11,,,SKR.254
Figure 17 lower cabin triangle, rear of tube tu12 (note, find SKR254 in assembly bag A9)
b) Assemble the pair of lower cabin triangle tubes
tu12
to the main undercarriage
cross-beam
tu9
using the fourth set of holes inwards from the ends of
tu9.
The front ends of the lower cabin triangle tubes
tu12
should have the
cut-outs on the inside, visible in Figure 19.
Bolt spacers are not needed in the steel undercarriage tube.
The bolts should pass upwards, to clear the undercarriage legs later.
Figure 18 starboard end of tu9, looking from front.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...