175
Nynja Build Manual 1.4d
12.8 Fuel filler
a) Cut a 89mm diameter hole in the fuselage fairing to accept the fuel filler fitting
in the position shown below:
Figure 232 filler location
b) Offer up the filler hose and find the best angle for the filler to be positioned
c) The fitting can now be secured to the fuselage
– by drilling and using 4mm
nuts and bolts.
d) The flexible hose can now be cut to size and fitted
– secured with two ‘jubilee’
clips.
e) Finally fit a cap on the breather tube on the filler fitting. Use a 6mm plastic
nutcap and epoxy or hot glue.
Figure 234 Tank filler hose
150mm
from
joggled corner
120mm from
top of fairing
Cap on breather
tube here
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...