220
Nynja Build manual 1.4d
e) Repeat this process for the upper doors.
The upper edge of the Lexan is your accurate edge and should be
butted up against the edge of the angle. Cut a recess around the hinge
bulge to achieve this, using a file or dremel.
Allow generous overlaps front and rear and with the lower door at this
stage.
f) Refit the lower door. Using a chart pen or similar accurately mark the lexan for
trimming.
It should fit evenly just inside the joggle on the glassfibre door sill and
overlap the rear window by 25mm at the rear. Dress the final edges
with a sanding block to get a nice smooth rounded edge.
Apply 3mm self adhesive foam strip on the upper edge of the lexan
aligned with the top edge, where the upper door will overlap.
Figure 301 lower door lexan fit
g) Refit the upper doors, mark and trim the lexan.
Figure 302 upper door lexan fit
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...