c)
Lower edge of firewall sits under the floor plan as shown below don’t fix at this
stage.
Figure 189 position of lower edge of firewall
d) Fit scuttle moulding in position. It can be fixed to the firewall sides in the
position shown below.
The photo shows a reference mark in the moulding
(illustrated by the arrow). Firewall top edge should be positioned 35mm below
this mark as shown.
Figure 190 position of firewall relative to scuttle moulding
e) Fix the firewall edges to the scuttle
– using 3mm countersunk rivets. Use just
one top and one bottom each side for now (t
he rest will be fitted when the
exact position of the cowling screws are determined to ensure even spacing)
Drill a 3mm hole. Then take a 10mm drill bit and apply light pressure to
contersink the glassfibre until the rivet head sits flush..
f) Move now to the top edge of the firewall. This is fixed to the upper forward
edge of the scuttle.
The outer edges will need bending downwards in a slight
curve to match the curve of the moulding. This can be done with some light
hand pressure. The aluminium will also need triming to match the edge of the
moulding. When happy with the fit fix using 3mm countersunk rivets. Use just
two for now 50mm either side of the dead centre. The rest will be fitted when
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...