Nynja Build Manual 1.4d
2. Forward Fuselage
Note: During assembly of the fuselage, hand tighten the bolts only as far as the
Nyloc section. After the fuselage is complete and you are sure it is correct, you
can go back and tighten all of the nuts.
If you wish plain nuts, or even better wing nuts, can be used in the initial construction,
to be replaced with Nylocs when the time comes to tighten the nuts up. However,
note that it is often beneficial to have the nuts loose anyway, to ease any alignment
difficulties.
2.1 Tube Numbering
Refer to these drawings for tube numbers throughout the forward fuselage assembly
sequence.
Figure 11 cabin lower and upper triangle tube numbering.
Figure 12 cabin viewed from port side, and rear cabin frame viewed from rear.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...