29
Nynja Build Manual 1.4d
b) Apply threadlock to the bolt securing guide
SKR90
to the front vertical
tu14
and tighten firmly, but take care not to distort or crush the tube.
This should be done at this stage as the bolt holding this bracket is not
easily accessible later.
Whilst the spacer should prevent crushing of the tube, it is better not to
rely on it. It is permissible for the spacer to remain slightly loose, as
under load it will still prevent excessive deformation of the tube.
Do not distort the tube.
c) Mount the U-brackets
SKR76
to the lower cabin triangle tubes
SKR12
Note the use of a spacer sleeve in the tubes.
The studs should be long end downwards to mount the bottom of the
firewall and the front of the fuselage covering later.Discard the curved
metal washer if fitted
– as this is a Skyranger part not used for the
Nynja.
If the bolt thread sticking out of the nut securing the U brackets to the
TU14 fouls the TU12 end file the end of the TU12 to provide clearance
d) Mount the steel diagonal-brace
SKR43
to the bottom of the stud through the
port tube. Use thin plastic washers
W.FL-1-6-24
and steel washers
SKR456.001
The other end of the brace will be attached to the rudder pedal mounts
later. The brace may be supplied attached to the mounts, have a look
under the packaging.
Thin plastic washers may be used to take up any slack between the
tubes and U-brackets.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...