102
Nynja Build Manual 1.4d
c) Wrap some webbing straps around the fairings and tension to pull together.
Take care to do this gently and protect the fairings against any buckles
or ratchet levers.
Figure 118 strapping
d) Verify correct positioning:
The halves should line up together and the front side edges should align
with the rear cabin vertical TU6 tube so that the moulded ‘joggle’ (step) is
paralell and the middle of the joggled edge meets the tube centre
– Fig 119
below
Figure 119 showing alignment of rear fairing with TU6 upright tube.
This should also coincide with the rear of the fairing halves being butted
up against the rear of the fin post
– Fig 120 below.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...