159
Nynja Build Manual 1.4d
f) The front Starboard pipe incorporates a sliding joint. Leave tightening this pipe
until last. Before fully tightening the bolts, slacken the clamp and adjust the
length so that all four pipes fit evenly into the exhaust.
If this pipe is adjusted too short the front starboard and rear port pipes
will not seal properly and if too long the front port and rear starboard
pipes
will not seal properly. This will result in an exhaust blow or ‘tick’.
When happy with the fit tighten the mounting bolts and the clamping
bolt. Do a final check with a good firm ‘wiggle’- you should not be able
to see/ feel any uneven seating.
Figure 203 Port front pipe, showing clamp on sliding section
g) Fit the twin outlet pipes. Adjust their position so they are clear of the firewall by
approximately 20mm, then tighten. Lockwire between the safety loops (this is
to prevent loss of a pipe if the clamping comes loose for some reason).
Figure 204 overview from port side.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...