100
Nynja Build Manual 1.4d
6 Fitting the Rear Fuselage Fairings
Do not cover the fuselage until it has been inspected!
See the inspection schedule in your BMAA paperwork.
Important: Before covering the fuselage, make sure the cables bracing the rear
fuselage have been tightened and the turnbuckles have been safety wired and all
bolts are done up and threadlocked. Particularly check for any plain nuts that might
have been missed!
6.1 Preparing the rear fuselage fairings
a) Before being fitted the composite fairing panels have to be handled with care
and can be easily damaged. Four hands are required to move the fairings
around, and care should be taken to protect them from being scratched and to
support them appropriately when working on them off the aeroplane. Flexing
them too far can result in surface cracking.
b) The fairings are marked with cut lines where parts of the structure protrude
such as the control cables, tailplane front mounting bracket and certain bolt
heads. These should be carefully cut out prior to fitting the fairings to the
fuselage. There may also be moulding flashings that need trimming and edges
smoothed. Underneath at the rear is a 15cm diameter hole to permit access.
c) A Dremel multi tool is recommended for these tasks and can be used with a
cutting disc to open up the holes, and a sanding attachment to trim exactly to
the cut lines. Some final hand or block sanding may be required for that
perfect edge.
Figure 116 fairing cutouts
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...