138
Nynja Build Manual 1.4d
9. Windscreen Frame and Throttles
Before mounting the cowlings and firewall, the windscreen support frames should be
installed. These parts position the rear edge of the cowlings.
9.1 Windscreen Frame
Figure 168 cabin uprights ( note that saddle washer shown may be superseded by flattened
tube sides and 1mm plastic washer should then be used).
a) Attach the bottom of the cabin uprights
SKR34
to the outer edges of the
rudder pedal mounting bar as shown above. Note that the bolt fixing the lower
bracket to the upright tube
SKR34
has the nut and washer inside the tube.
The thread will be too long as supplied and need trimming to be short enough.
The vertical bolts also pass through the floor (omitted from this picture above
for clarity), and the outer one each side should have a penny washer under
the nut to spread the load into the floor without crushing.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...