277
Nynja Build manual 1.4d
28 Amendments
Date
Page No.
Change / Addition
Change to issue 0.2
– tidying of figure numbers and references.
Spelling and grammar minor changes. Addition instructions for preparing
fairings (page 100). Addition of instructions for small bracing angle in
centre of rear fuselage (page 104). Deletion of instructions to fit CDI
support bracket. Revision to loctite specification (page 109).
25.02.11
Change to issue 0.3
– Further tidying of figure references. Page 57,
correction to rear fuselage attachment reference. Page 78 change to
brake line instructions. Page 138, change to Figure 164 caption. Page
144, reference added about cutting throttle torque tube to length. Page
149, additional instructions to cut floor to accept flap detent lever. Page
154, change to figure 190 caption. Page 161-162, change to oil cooler
fitting measurements and instructions to correct clearance issues. Page
175, change to jubilee clip securing dashboard supports. Page 220
additional measurements and instructions for trim lever fitting. Page 223-
226 changes to console fitting instructions, due to small design change
of moulding. Page 242-243, incorporation of heater option fitting
instructions. Page 248, additional instructions for flap neutral setting.
10.03.11
Change to issue 1.0. Figure reference correction page 110. Change of
oil cooler lateral position and fixing brackets positioning. Change of hose
routing from Oil cooler
– section 11.2. Change of sequence for fitting
upper fin fairing, section 23.2. Change of fixing for cable outlet fairings
from rivets to plastic screws
– section 23.4. Change of edge distance for
rivet holes in wingtips to 40mm, section 23.7.
05.12.11
Change to issue 1.1 tidy up of Figs 53,73,79,85,106 215to prevent
possible confusion. Text changes for brake advice, Fuel breather
balance pipe, possible incorrect assembly of central frame, fuselage
cable tangs,possible incorrect alignment of elevator joiner, Fin forward
attach bolt spacer, finding SKR9 and 88 in kit packaging, rudder pedal
adjustment, bungee loops, air filters, firewall fixing.
23.12.12
Change to issue1.2 Correction of erroneous reference to firewall in 11.2
c). Explanation of WTG sender fitting 11.3 e). Change of tank filler
instructions and pictures to reflect latest arrangement 12.2.4. Correction
of position of Cable guide bracket 14 a). Change of heater valve fitting
instructions and pictures to reflect latest arrangement 25.. Addition of
advice for cutting flap rod exit holes in lexan17.2 d). Correction of fitting
method for wing profile blocks 24 c). Change/ removal of parts of
Weighing advice to reflect changes to BMAA spreadsheet 26.7.
13.02.13
Change to issue 1.3. Correction of part numbering in various sections.
Additional advice for fitting extension tubes for main wheel spats.
Change to floor references to reflect new composite floor panel.
Correction of plastic washer size to 3mm on Fig66. Removal of old
sentence remnant form 3.5b)
28.03.13
Correction of root batten part numbers, correction of picture orientation
and hole size guidance for heater fitting.
19.07.14
Change to issue 1.3 - change of build support email. 1.5
– change to
add weight info for slipper clutch and large starter. Advice for changing
nuts and washers to stainless steel.2.8
– change of sequence for floor
fitting for later non flexible composite floor. 2.9 saddle washer sequence
adjustment.10.3
– corrected ommision of application of intumescent
paint.5.4
– additional information for fitment of rudder brace.
07.02.15
Change of contact details, numbering of instrument panel angles, fuel
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...