Nynja Build Manual 1.4d
Fig 185 mark cut line
i) When happy with fit drill and fix in place with white aluminium 4mm rivets.
Evenly spaced at 65mm or so.
Fix initially with clecos then ensure all swarf is removed before final riveting.
Fig 186 final fixing
j) Fix the front to the door pillar tubes (SKR34) using three 4mm aluminium
rivets each side.
Countersink the rivets using a 10mm drill bit to countersink the
glassfibre so the rivets sit flush.
k) Fix the rear edge with 4x10 white plastic screws and self locking plastic nuts.
l) Cut slot in floor to allow flap detent lever to pass through
– see Figure 181
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...