Mechanical installation
3.3 Installation
Enclosed Drives
Operating Instructions, 12/2018, A5E36652151A
53
3.3.5
Line connection from above (option M13), motor connection from above
(option M78)
Description
On options M13 and M78, the connection straps for the power cables, the clamping bar for
mechanically securing the cables, an EMC shield bus, and a protective ground busbar are
located within the tophat.
The busbars for connection from above are fully mounted when the system is delivered.
For transport reasons, the tophats are delivered separately and must be mounted on site.
With options M23, M43 and M54, plastic ventilation grilles and filter mats are also supplied.
Based on the number of cables and the cable cross-sections used, holes must be drilled for
attaching cable glands through which cables will be inserted.
Note
Connecting the control cables
The control cables and optional brake resistors are connected as before from below.
Attaching the tophat
1.
Remove the crane transport assembly (if fitted).
2.
Options M43 and M54 only:
Use the sealing tape provided to attach the contact surfaces of the tophat to the top of the
cabinet.
3.
Fit the tophat to the roof of the cabinet at the positions specified (fixing points for the
crane transport assembly).
4.
To secure the power cables, remove the front panel of the tophat.
Summary of Contents for SINAMICS S150 NEMA
Page 1: ......
Page 2: ......
Page 20: ...Table of contents Enclosed Drives 18 Operating Instructions 12 2018 A5E36652151A ...
Page 861: ......
Page 862: ......