Commissioning
5.5 Initial commissioning with the AOP30
Enclosed Drives
256
Operating Instructions, 12/2018, A5E36652151A
NOTICE
Material damage when selecting the incorrect encoder supply voltage
Once the encoder has been commissioned, the supply voltage (5/24 V) set for the encoder
is activated on the SMC30 module. The encoder may be damaged, if a 5 V encoder is
connected and the supply voltage has not been set correctly (bit 20 = "Yes," bit 21 = "No").
•
Set the correct supply voltage for the connected encoder.
Basic commissioning: Entering the basic parameters
Entering the basic commissioning
parameters:
p0700: Preset command source
5: PROFIdrive
6: TM31 terminals
7: Namur
10: PROFIdrive Namur
p1000: Preset setpoint source
1: PROFIdrive
2: TM31 terminals
3: Motorized potentiometer
4: Fixed setpoint
Once a setpoint source has been selected
(p1000), the main setpoint p1070 is
defaulted accordingly.
To navigate through the selection fields,
choose <F2> or <F3>.
To activate a selection, choose <F5>.
To change a parameter value, navigate to
the required selection field and activate
with <F5>.
Another window appears in which you can
- enter the required value directly, or
- select the value from a list.
Summary of Contents for SINAMICS S150 NEMA
Page 1: ......
Page 2: ......
Page 20: ...Table of contents Enclosed Drives 18 Operating Instructions 12 2018 A5E36652151A ...
Page 861: ......
Page 862: ......