
Mechanical installation
3.3 Installation
Enclosed Drives
Operating Instructions, 12/2018, A5E36652151A
51
Removal
The transport eyebolts can be unscrewed and removed. Depending on the length of the
cabinet or transport unit, the support rails can have a varying number of fastening screws.
These must be unscrewed and removed before the rails can be removed.
WARNING
Incorrect handling of the mounting rails
The improper handling of heavy carrying rails during disassembly can cause injuries or
material damage.
•
Ensure careful handling of the carrying rails during disassembly.
•
Prevent screws from falling into the unit during disassembly and so causing damage
during operation.
Original roof screws
Figure 3-9
Original roof screws, accessory kit
After removing the crane transport aids, the removed transport eyebolts or the fixing screws
of the transport beam must be replaced by the original roof screws from the accessories
pack supplied in order to ensure compliance with the degree of protection and proper
grounding of the cabinet.
Figure 3-10 Delivery state (left), original roof screws (right)
Summary of Contents for SINAMICS S150 NEMA
Page 1: ......
Page 2: ......
Page 20: ...Table of contents Enclosed Drives 18 Operating Instructions 12 2018 A5E36652151A ...
Page 861: ......
Page 862: ......