![Proximus Forum 500 Series Mounting And Commissioning Manual Download Page 95](http://html.mh-extra.com/html/proximus/forum-500-series/forum-500-series_mounting-and-commissioning-manual_1621336095.webp)
Forum Gateway 560 Installation
93
Installation in a 19" Rack
Forum Gateway 560: 1-12 frame mounting points
A Forum Gateway 560 is designed to be installed in 19" racks only.
The following mounting points for installation in a 19" rack can be found on
the 1-12 frame:
Legend
1
Left mounting bracket
2
Right mounting bracket
A
Mounting bracket screw bolts for front mounting (approx. 132 mm) to
the uprights of the 19" rack
B
Mounting bracket screw bolts for mid-mounting (approx. 400 mm) to
the uprights of the 19" rack
C
Left and right screw points for earthing wrist strap or circuit common
connection between 1-12 frame and 19" rack
B
A
C
1
2
C