Introduction
2 - 29
Starting a Test
Preconditions to start a test
1. The required test card is defined, the test parameters are set.
2. The software is in the Test Card View.
3. The Emergency Stop button is released.
4. The safety key lock is set to the "enable" position.
Pressing the I/O (test start/stop) push-button starts the test. Pressing this
push-button a second time stops the test.
While a test is running, several functions such as changing the test card,
changing the view etc., are disabled.
To repeat the test, the test results need to be cleared beforehand. Otherwise the
start is blocked.
Note:
Tests can only be started and stopped with the I/O (test start/stop)
push-button while in the Test Card View.
Each test card represents a separate test, and is started individually.
Note:
Stopping a test
does not
shut off
the
CPC 100
outputs
instantaneously
. First, the currently running test sequence finishes,
then the test execution is stopped.
Most test cards finish the running test sequence with a predefined
ramp function.
Therefore
,
in an emergency situation never press "Stop Test".
Instead, use
Emergency Stop
.
Summary of Contents for CPC 100
Page 12: ...CPC 100 V1 41 x...
Page 28: ...CPC 100 V1 41 1 16...
Page 90: ...CPC 100 V1 41 3 14...
Page 194: ...CPC 100 V1 41 6 30...
Page 250: ...CPC 100 V1 41 8 32 Figure 24 Settings of Amplifier test card for this example use case...
Page 258: ...CPC 100 V1 41 9 4...
Page 264: ...CPC 100 V1 41 10 6...
Page 282: ...CPC 100 V1 41 12 10 Figure 9 Saving tests with the CPC Editor...
Page 284: ...CPC 100 V1 41 12 12...
Page 312: ...CPC 100 V1 41 14 12...
Page 316: ...CPC 100 V1 41 15 4...
Page 350: ...CPC 100 V1 41 16 34...
Page 372: ...OMICRON Contact Addresses 22...