5.1.9. Mounting rear markers to the rear harrow . . . . . . . . . . . . . . . . . . . . . . . . .
5.1.10. Turning the rear railing of the working platform and attaching the
5.2.3. SeedPilot and SeedPilot ISOBUS control system commissioning . . . .
5.2.3.1. Tramline setup setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.3.2. Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.3.1. Adjusting the length of the boom of the wheel packer . . . . . . . . . . . . .
5.3.3. Adjusting the lengthwise level of the machine with a turnbuckle . . .
5.3.4. Adjusting the lengthwise level of the machine with a drawbar
6.3.3.1. Control method selection - Option 1 . . . . . . . . . . . . . . . . . . .
6.3.3.2. Control method selection - Option 2 . . . . . . . . . . . . . . . . . . .
6.3.6. Middle markers manual control and forcing operation . . . . . . . . . . . . .
6.6.1. Preparations preceding hopper lling in a machine without a
6.6.2. Preparations preceding hopper lling in a machine with a gearbox
on the seed side or a dual gearbox . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Operation and maintenance manual
1.00
FX300 and FX400 SeedPilot
3 (208)
Summary of Contents for FX300 SeedPilot
Page 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 201: ...Hydraulic schematics FX300 and FX400 2...
Page 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 203: ...Hydraulic schematics FX300 and FX400 4...
Page 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...