5.1.10. Turning the rear railing of the working platform and attaching
the end railing
Figure. 5.1.10. - 70. Turning the rear railing of the working platform
Number
Component
Quantity
1.
Rear railing
1 pc
2.
Locking nut M8
8 pcs
3.
Washer M8
8 pcs
4.
U-bolt
4 pcs
For transport, the rear railing (1) of the working platform has been turned inward.
1. Open the bolts of the rear railing of the working platform.
2. Turn the railing outward and attach the railing to the working platform with washers (3),
U-bolt (4) and locking nuts (2).
3. Repeat step 2 for all attachment points of the rear railing.
Operation and maintenance manual
1.00
FX300 and FX400 SeedPilot
69 (208)
Summary of Contents for FX300 SeedPilot
Page 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 201: ...Hydraulic schematics FX300 and FX400 2...
Page 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 203: ...Hydraulic schematics FX300 and FX400 4...
Page 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...