1. Raise the front levelling board using lifting slings and push it under the wheel packer
drawbar to the body of the machine.
2. Fasten the front levelling board to the machine body with components (1-5).
The front levelling board is fastened to the machine body at three fastening
points. Place a shim between the front levelling board and machine body at the
fastening point on the left side of the machine (looking from the front).
Mounting the front levelling board on a FX400
Figure. 5.1.4. - 59. Mounting the front levelling board on a FX400
Number
Component
Quantity
1.
Hex screw M24x60
7 pcs
2.
Washer M24
26 pcs
3.
Locking nut M24
13 pcs
4.
Hex screw M24x75
3 pcs
5.
Shim
5 pcs
6.
Hex screw M24x120
3 pcs
1. Raise the front levelling board using lifting slings and push it under the wheel packer
drawbar to the body of the machine.
2. Attach the front levelling board to the machine body with components (1-6).
The front levelling board is fastened to the machine body at ve fastening points.
Place a shim between the front levelling board and machine body at the second
fastening point on the left side of the machine (looking from the left side). Place 4
shims between the front levelling board and machine body at the centremost
fastening point.
Operation and maintenance manual
FX300 and FX400 SeedPilot
1.00
60 (208)
Summary of Contents for FX300 SeedPilot
Page 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 201: ...Hydraulic schematics FX300 and FX400 2...
Page 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 203: ...Hydraulic schematics FX300 and FX400 4...
Page 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...