Figure. 5.1.1. - 52. Mounting the wheel packer
3. Place the washer (1) against the inner shoulder of the attachment points and insert the
mounting pin (2) through the shoulders and the mounting cylinder of the bar.
4. Lock the mounting in place with a spring cotter.
5. Repeat steps 3-4 for the second attachment point.
Figure. 5.1.1. - 53. Hydraulic hoses and electrical wires
6. Open the fastening screw (3) of the tube mounts and remove the top (4).
7. Draw the hydraulic hoses through the guide (1) and on both sides of the cylinder bracket
(2).
8. Use cable ties to fasten the hoses on both sides of the cylinder bracket.
Do not tighten the cable ties to the nal tightness.
9. Place the hoses in the tube mounts and fasten the top of the tube mounts and the
fastening screws.
Operation and maintenance manual
1.00
FX300 and FX400 SeedPilot
55 (208)
Summary of Contents for FX300 SeedPilot
Page 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 201: ...Hydraulic schematics FX300 and FX400 2...
Page 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 203: ...Hydraulic schematics FX300 and FX400 4...
Page 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...