Figure. 5.1.4. - 57. Lifting the front levelling board
1. Fasten the lifting slings (1) around the tube (2).
DANGER
Ensure that the capacity of the lifting sling and the lifting device is sufficient. The
front levelling board weighs 250 kg.
2. Follow the mounting instructions for the FX300 or FX400
Mounting the front levelling board on a FX300
Figure. 5.1.4. - 58. Mounting the front levelling board on a FX300
Number
Component
Quantity
1.
Hex screw M24x60
5 pcs
2.
Washer M24
16 pcs
3.
Locking nut M24
8 pcs
4.
Hex screw M24x75
3 pcs
5.
Shim
1 pc
Operation and maintenance manual
1.00
FX300 and FX400 SeedPilot
59 (208)
Summary of Contents for FX300 SeedPilot
Page 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Page 201: ...Hydraulic schematics FX300 and FX400 2...
Page 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Page 203: ...Hydraulic schematics FX300 and FX400 4...
Page 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...