5. Verify by visual inspection or by sound that the washer reservoir begins to fill
with water (the water-fill solenoid should open when you turn the main power
supply and the clock-override switch ON). Refer to Fig. 2-7 for the water-
supply connection location.
6. Set the ASE Timer to 1 minute or any desired time between 0-10 minutes.
7. After about two hours, check the washer reservoir to verify or adjust the set-
point water level. (While the reservoir fills, you can continue with the power-
up procedure.)
Water-Level Control:
The water-level control system is fully installed in the power washer and requires
only verification that the set-point water level is correct for operation of the machine.
Follow these steps to verify or adjust the set-point water level:
1. Remove the float control box cover by removing four (4) screws. Refer to the
following figure:
Fig. 2 - 16: Float Control Box
Cam Set
Screws
Float Cam
Lower Limit
Switch FS-2
Upper Limit
Switch FS-1
Float
Rod
Summary of Contents for Cyclone 30 Series
Page 295: ...MART REVISION 06 06 06 Revision 03 OWNER S MANUAL for MART VERTICAL POWER WASHER PUMP...
Page 308: ...12 Fig 1 Main Pump Cut Away 1530 Frame Hardened Steel Throttle Bushing...
Page 310: ...14 Fig 2 Main Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 312: ...16 Fig 3 Main Pump Cut Away 12V Frame Composite Throttle Bushing...
Page 314: ...18 Fig 4 Boost Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 316: ...20 Fig 4 Boost Pump Cut Away 12V Frame Composite Throttle Bushing...