
Options
7 - 29
Standard Turntable Power Washer v.
4
.0
The MART Corporation
4.3. Operations
Follow this procedure
:
1. Check the
conductivity reading
on the
controller panel
at the chemical
concentration recommended by your chemical supplier, or developed through
process-control testing (refer to chapter
"Advanced Operations: Process-
Control."
)
2. Adjust the
LO
set point
to this reading.
NOTE
: Refer to the controller-vendor-supplied manual for
instructions on changing ranges and setting set points.
3. Insert the
peristaltic pump suction tube
into a
barrel
of 50%-diluted chemical
concentrate.
NOTE:
The peristaltic pump only pumps during wash cycles when
chemical is needed.
Summary of Contents for Cyclone 30 Series
Page 295: ...MART REVISION 06 06 06 Revision 03 OWNER S MANUAL for MART VERTICAL POWER WASHER PUMP...
Page 308: ...12 Fig 1 Main Pump Cut Away 1530 Frame Hardened Steel Throttle Bushing...
Page 310: ...14 Fig 2 Main Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 312: ...16 Fig 3 Main Pump Cut Away 12V Frame Composite Throttle Bushing...
Page 314: ...18 Fig 4 Boost Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 316: ...20 Fig 4 Boost Pump Cut Away 12V Frame Composite Throttle Bushing...