2 - 10
Installation, Operations, and Maintenance Manual
The MART Corporation
Standard Turntable Power Washer v. 4.0
After you have moved, placed, and unpacked the washer you are
ready to perform the following parts of the installation process:
·
Leveling and anchoring
·
Connection procedures
·
Services and connections verification
·
Startup procedure
IMPORTANT! Before you go any further, get the
Field Startup
Procedure (FSP
) form (it is in a pocket on the inside of the
electrical-control-panel door). You will use the form as a
checklist to ensure correct installation as you follow the steps
in the next several sections.
Use the
Field Startup Procedure (FSP)
form in this way
:
1. As you install the washer, fill in the
Field Startup Procedure (FSP)
form.
2. After you have completed a successful installation, sign and date the form.
3. Make 1 copy and keep for your records. Mail/FAX to MART the other copies
being sure it is properly signed and dated.
4. Keep your copy in your maintenance records. You will need it during
maintenance procedures, and any time you call MART.
NOTE
: Information gathered on the
FSP is critical
in verifying
initial performance and in providing a benchmark for future
diagnostic and troubleshooting efforts!
Be sure to fill in the FSP
during installation!
Summary of Contents for Cyclone 30 Series
Page 295: ...MART REVISION 06 06 06 Revision 03 OWNER S MANUAL for MART VERTICAL POWER WASHER PUMP...
Page 308: ...12 Fig 1 Main Pump Cut Away 1530 Frame Hardened Steel Throttle Bushing...
Page 310: ...14 Fig 2 Main Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 312: ...16 Fig 3 Main Pump Cut Away 12V Frame Composite Throttle Bushing...
Page 314: ...18 Fig 4 Boost Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 316: ...20 Fig 4 Boost Pump Cut Away 12V Frame Composite Throttle Bushing...