Installation
2 - 35
Standard Turntable Power Washer v. 4.0
The MART Corporation
6. Startup Procedure
A MART factory-trained technician is optionally available to perform startup and
customer training. Call MART to request this service. As part of this service, the MART
technician will fill in the
Field Startup Procedure (FSP)
form to begin your one-year
warranty coverage.
If you perform the startup, training your staff to operate the power washer is your
responsibility
.
The startup procedure consists of the following activities, in this order:
·
Electrical connections inspection
·
Lubrication
procedure
·
Power-up Procedure
Preliminary checks
Supply Voltage
Water Fill
Water Level Control
Control Voltage
Heat – Gas, Electric, Steam, Oil
Pump/s Rotation Direction
Temperature Control
Voltage Readings
Amp Readings
Water Hammer Test
Standard Operational Checks
Pump Low-Low Water Shutdown
Door Close Limit Switch Operation
Heater Low-Low Water Shutdown
·
Chemical-charging procedure
·
Test-wash procedure
NOTE:
Fill in the
Field Startup Procedure
(FSP)
form
as you perform
startup. Send it to MART. After it has been verified and accepted, your
one-year warranty period will begin.
This form must be received by
MART within 60 days after receipt of your washer!
WARNING! Be sure that people who perform the startup
procedure are qualified and trained for the task. They must
follow all procedures exactly as described.
Summary of Contents for Cyclone 30 Series
Page 295: ...MART REVISION 06 06 06 Revision 03 OWNER S MANUAL for MART VERTICAL POWER WASHER PUMP...
Page 308: ...12 Fig 1 Main Pump Cut Away 1530 Frame Hardened Steel Throttle Bushing...
Page 310: ...14 Fig 2 Main Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 312: ...16 Fig 3 Main Pump Cut Away 12V Frame Composite Throttle Bushing...
Page 314: ...18 Fig 4 Boost Pump Cut Away 1530 Frame Composite Throttle Bushing...
Page 316: ...20 Fig 4 Boost Pump Cut Away 12V Frame Composite Throttle Bushing...