Chapter 13 Replacing and Cleaning Loading Parts on a Regular Basis
13-12
4
Install the V2 rack removed in
step 9
in
“13.3 Replacing Opposed Roller (Page 13-7)”
.
5
Install the V1 rack removed in
step 8
in
“13.3 Replacing Opposed Roller (Page 13-7)”
.
6
Install the rack retainer plate removed in
step 7
in
“13.3 Replacing Opposed Roller (Page 13-
7)”
.
• Two screws (M3
×
6)
×
2 positions
7
Install the cover removed in
step 6
in
“13.3 Replacing Opposed Roller (Page 13-7)”
.
• One screw (M3
×
6)
×
2 positions
8
Install the V4 rack removed in
step 5
in
“13.3 Replacing Opposed Roller (Page 13-7)”
.
• Two screws (M3
×
20)
9
Return the position of the gear back turned forward in
step 4
back in
“13.3 Replacing Opposed
Roller (Page 13-7)”
and tighten the screw.
• One screw
10
Install the V5 rack removed in
step 2
in
“13.3 Replacing Opposed Roller (Page 13-7)”
.
• Two screws (M3
×
20)
11
Install the heat process unit and the left cover with reference to
“
Installation Procedure
(Page 9-5)”
in
“9.1.1 Removing/Installing Heat Process Unit”
.
12
Return the supply tray and tray shutter to their original positions.
This is the end of the process of replacing the opposed roller and cleaning the guide.
Caution
After the installation of the rack, confirm that the installed gear of the rack to operates properly
by moving the gear by hand.
Caution
Take sufficient care when handling the tray shutter, as it may be impossible to insert if it
becomes deformed due to rough handling.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......