Chapter 12 Replacing Loading Parts in the Exterior of Main Unit
12-10
10
Fix the status lamp wire removed in
step 6
to the status lamp cover.
11
Install the connector (JP27) removed in
step 7
on the status lamp cover.
12
Install the lamp cover removed in
step 5
.
13
Remove the status lamp cover removed in
step 4
.
14
Remove the ejection unit cover removed in
step 3
.
• Two screws (M4
×
8)
15
Connect the relay connector (JJ27) removed in
step 2
.
16
Install the exterior of the operation panel with reference to
“
Installation Procedure (Page
12-5)”
in
“12.2 Removing/Installing Exterior of Operation Panel”
.
17
Return the supply tray and tray shutter to their original positions.
This is the end of the process of replacing the status lamp.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Take sufficient care when handling the tray shutter, as it may be impossible to insert if it
becomes deformed due to rough handling.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......