Chapter 11 Replacing Loading Parts in Main Unit
11-7
11.3 Replacing Main Board
Replace the main board that controls DRYPRO 832.
Work outline
The number of personnel and the estimated work hours required to replace loading parts is as follows:
Requirements
The procedure for replacing loading parts requires the following tools:
1
Remove the LAN cover and film ejection tray with
reference to
“
Removal Procedure (Page 3-
10)”
in
“3.3.2 Removing/Installing Film Ejection
Tray”
.
2
Remove the connector cover.
3
Remove connectors from MEC IF (CCN5),
exposure IF (CCN6), and power supply (JP52).
Caution
•
Be sure to turn off power and remove the power cable from the electrical outlet before removing or
installing the exterior cover or replacing loading parts.
•
To avoid damage to the board caused by electrostatic discharge, wear a wrist grounding strap with
reference to
“3.4 Installing a Grounding Strap (Page 3-24)”
when accessing the board for work.
Number of
Personnel
Work Hours
1
10 minutes
No.
Tools
No.
Tools
1
Various types of screwdrivers
2
Tray (container for screws and parts removed)
3
Main board (for replacement)
4
Grounding strap
Caution
When removing the connector, do not pull by
the wires, but hold the tab on the connector
with your fingers.
Pulling by the wires too tightly can cause a
break.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......