Chapter 11 Replacing Loading Parts in Main Unit
11-10
19
Connect the connector (JP24) removed in
step 4
of the control box DC fan.
20
Connect the connectors removed in
step 3
to MEC IF (CCN5), exposure IF (CCN6), and power
supply (JP52).
21
Install the connector cover removed in
step 2
.
22
Install the LAN cover and film ejection tray with reference to
“
Installation Procedure (Page
3-11)”
in
“3.3.2 Removing/Installing Film Ejection Tray”
.
This is the end of the process of replacing the main board.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......