Chapter 13 Replacing and Cleaning Loading Parts on a Regular Basis
13-6
12
Connect the connector (JJ48) removed in
step 5
.
13
Install the lower front cover.
• Two screws (M3
×
8)
14
Put the supply tray back into the main unit.
15
Remove the tray shutter and return it to the
previous position.
This is the end of the process of replacing the pickup rollers.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Take sufficient care when handling the tray
shutter, as it may be impossible to insert if it
becomes deformed due to rough handling.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......