Chapter 7 Replacing Sub Scan Unit Loading Parts
7-18
16
Connect the connector (JJ51) removed in
step 6
.
17
Install the exposure unit mounting frame unit assembly removed in
step 5
.
• Four screws (M4
×
6)
18
Connect the connector (JP10) removed in
step 3
.
19
Install the main scan unit with reference to the
step 6
and
7
in
“8.2 Replacing Exposure Unit (Page 8-3)”
.
20
Install the sub scan unit with reference to
“
Installation Procedure (Page 7-7)”
in
“7.2
Removing/Installing Sub Scan Unit (Including the Exposure Unit and Position Regulation
Unit)”
.
21
Return the supply tray and tray shutter to their original positions.
This is the end of the process of replacing the position regulation inlet sensor.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Take sufficient care when handling the tray shutter, as it may be impossible to insert if it
becomes deformed due to rough handling.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......