Chapter 9 Replacing Loading Parts in Heat Process Unit
9-6
3
Connect the relay connectors (JJ60, JJ73, JJ74,
JJ75, JJ76, and JJ77).
4
Fix the wire with the wire saddles.
• Wire saddle in four locations
5
Install the left cover with reference to
“
Installation Procedure (Page 3-23)”
in
“3.3.6
Removing/Installing Left Cover”
.
6
Put the supply tray back into the main unit.
7
Remove the tray shutter and return it to the
previous position.
This is the end of the process of installing the heat process unit.
Caution
Be sure to push the connector all the way in
when connecting it.
If the connector is not connected properly,
an error will occur and, in some cases,
smoke and/or an odor may be generated.
Caution
Take sufficient care when handling the tray
shutter, as it may be impossible to insert if it
becomes deformed due to rough handling.
Summary of Contents for Drypro 832
Page 2: ......
Page 12: ......
Page 22: ......
Page 28: ......
Page 74: ......
Page 118: ......
Page 228: ......
Page 242: ......
Page 388: ......
Page 498: ......
Page 521: ...18 23 18 5 Block Diagram ...
Page 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Page 529: ......