
7
1
3
KEB COMBIVERT F5
Name: Basis
04.05.04
7
©
KEB Antriebstechnik, 2002
All Rights reserved
Start-up
Section
Page
Date
Chapter
7.1.1
After unpacking
the Goods
7.1
Preparatory
Measures
7.1.2
Installation and
Connection
7. Start-up
The following chapter is intended for everybody who has no experience with the KEB
frequency inverters. It shall allow a correct entering into this field. But because of the
complex application possibilities we must restrict ourselves to explaining the start-up
of standard applications.
After unpacking the goods and checking them for complete delivery following measures
are to be carried out:
!
Visual control for transport damage
Should any external damages to the KEB COMBIVERT be visible get in touch
with your forwardig agent and return the unit with a corresponding report to
KEB.
!
Check the voltage class
Absolutely check before assembly whether the supply voltage of the KEB
COMBIVERT matches the application.
Picture 7.1.2.a
Installation and connection
The EMC-conform installation of the inverter is described in the Instruction Manual
Part 1. Installation and connection instructions are found in the Instruction Manual
Part 2.
!
The mounting surface of the inverter must be bright.
!
If necessary, use contact lacquer as protection against corrosion.
!
Connect the earthing strip to central point in the control cabinet.
Preparatory Measures
W
V
U
PB
-
+
L3
L2
L1
07.F
5.S0
C-12
20
9508
0402
CO
MB
IVE
R
CO
MB
IVE
RT
ENTER
STSTARART
F/R
FUNC.
SPEED
STSTOPOP