MAP 0390: Supervisor Power Problem
038 (continued)
Is there continuity on all three phases?
Yes No
039
– Replace ac filter.
– Go to Step 049 on page 1-236 to verify fix.
040
– Go to Step 033 on page 1-233.
041
– Go to Step 042
042
Is this an SP1 frame?
Yes No
043
– Check cable connections at circuit breaker and supervisor power supplies for any loose con-
nections.
Does there appear to be any loose connections?
Yes No
044
– Replace cable PDU-CB-L2.
Is this your first time at this step?
Yes No
045
– Replace supervisor power supply.
– Go to Step 049 on page 1-236 to verify fix.
046
– Go to Step 049 on page 1-236 to verify fix.
047
– Fix connections.
– Go to Step 049 on page 1-236.
048
–
Consult
9076 SP1 Maintenance Information for SP1-specific procedures.
049
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-235
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......