MAP 0350: POWER3 SMP Thin and Wide Node Control
011 (continued)
Select “System Verification”
Select “Base System”.
Does this test indicate a failure?
Yes No
012
– From the control workstation, reset this processor node.
Does processor node reset?
Yes No
013
Problem with reset.
– Go to Step 017 to continue isolation.
014
Node reset functioning properly.
Was this a solid problem? (If the problem was cleared by power-on only, answer No.)
Yes No
015
This is an intermittent problem.
– Please record following tracking information:
Node number
Date / Time fault reported
Type of fault reported
Action taken or component replaced
– Go to “MAP 0570: End of Call” on page 1-357.
016
Problem resolved.
– Go to “MAP 0570: End of Call” on page 1-357.
017
Problem with reset.
– From the control workstation, power off processor node.
– Place processor node in service position.
– Use the following prioritized table to continue service:
1-210
RS/6000 SP MAPs
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......