MAP 0230: Wide Processor Node Control
– Replace the node supervisor card.
– Perform "Node/Switch Supervisor Self-Test" in
IBM RS/6000 SP: Maintenance Information,
Volume 3, Locations and Service Procedures to verify replacement.
– Go to Step 048.
048
All LEDs are operating.
– Remove processor node from service position.
– Reconnect all cables at rear of the processor node.
– Go to “MAP 0570: End of Call” on page 1-357.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-119
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......