MAP 0520: Switch Assembly Environment
006
– One or more of the following conditions exist:
Voltage out of range: +5 V “shutdownP5”
Voltage out of range: +12 V “shutdownP12”
Voltage out of range:
−
5 V “shutdownN5”
– Have the customer remove the switch assembly from the active configuration and power off the switch
assembly.
– Put the switch into service position. Refer to "Service Position Procedures" in
IBM RS/6000 SP: Mainte-
nance Information, Volume 3, Locations and Service Procedures.
– Check cable conditions at switch supervisor card S00-SP-J102 and power card S00-PC-J903. Check
condition of cable wires, especially J903 pin A5 to J102 pin A3, and the appropriate connection (based
on message) shown below:
Voltage
Power Card - J903
Switch Supervisor - J102
+5 V
S00-PC-P903 pin B2
S00-SP-P102 pin A6
+12 V
S00-PC-P903 pin A3
S00-SP-P102 pin A5
−
5 V
S00-PC-P903 pin A1
S00-SP-P102 pin A7
– Leave cable disconnected at switch power card.
Does the switch supervisor control cable appear to be okay?
Yes No
007
Problem with switch supervisor control cable (S00-SP-P102).
– Go to Step 019 on page 1-304, Priority 4, to replace cable.
008
– Disconnect S00-PC-P902 at power card.
– Using a digital multimeter, measure resistance between the appropriate pins.
– Compare results with values in this table:
Voltage
Measure From
(positive lead)
To GND
(negative lead)
Acceptable Range
(in ohms)
+5 V(note)
Pin 1(note)
Pin 2 (black)(note)
1K - 5M(note)
+12 V
Pin 3
Pin 2 (black)
1K - 5M
−
5 V(note)
Pin 5(note)
Pin 7
Pin 2 (black)(note)
Pin 2 (black)
2 - 20(note)
2 - 20
Note:
HiPS-LC8 switch assembly has only +5 V (pin 1) and -5 V (pin 5).
Is the measured resistance(s) in the acceptable range?
Yes No
009
– If this is an HiPS-LC8 switch assembly, skip directly to Step 010 on page 1-303
(Step 009 continues)
1-302
RS/6000 SP MAPs
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......