MAP 0330: POWER3 SMP Thin and Wide Node Environment
038 (continued)
Are supervisor LEDs #3 and/or #4 flashing?
Yes No
039
– Go to “MAP 0130: Processor Node” on page 1-30.
040
–
Use the following prioritized table to continue service:
041
– Remove processor node from service position.
– From the control workstation, power on the processor node.
Are supervisor LEDs #3 and/or #4 flashing?
Yes No
042
Go to Step 055 on page 1-197.
043
Go to Step 038 on page 1-194 and replace the next highest priority component.
044
Problem with 48 volts sensing.
– From the control workstation, power off the processor node.
– Place the processor node in the service position.
–
Use the following prioritized table to continue service:
Priority
Component
Action
1
Interposer connector cable
1. Replace cable
2. Go to Step 041
2
interposer connector card
1. Replace card
2. Go to Step 041
3
CPU or I/O power assembly
1. Replace assembly
2. Go to Step 041
4
CPU I/O planar
1. Replace I/O planar
2. Go to Step 041
5
All replaced
Call next level of support.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-195
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......