MAP 0520: Switch Assembly Environment
055 (continued)
Does the failure condition still exist?
Yes No
056
– Put the circuit breaker in the Off (‘0’) position.
– Remove power cable (J1) and supervisor cable (J2) from the rear of the switch assembly. Then
remove the front panel assembly.
– Replace power supply PS2. Refer to "Removing the Switch Power Card(s) (HiPS 3.0, HiPS-LC8,
SPS, SPS-8)" in
IBM RS/6000 SP: Maintenance Information, Volume 3, Locations and Service
Procedures.
– Replace switch from the service position. Refer to "Service Position Procedures" in
IBM RS/6000
SP: Maintenance Information, Volume 3, Locations and Service Procedures.
– Go to Step 030 on page 1-307.
057
– Put the circuit breaker in the Off (‘0’) position.
– Remove power cable (J1) and supervisor cable (J2) from the rear of the switch assembly. Then remove
the front panel assembly.
– Replug power supply PS2 and replace the switch supervisor card. Refer to "Removing the Switch
Supervisor Card (HiPS 3.0, HiPS-LC8, SPS, SPS-8)" in
IBM RS/6000 SP: Maintenance Information,
Volume 3, Locations and Service Procedures.
– Reinstall the SPS front panel assembly, being careful to align the guide pins on the P1 connector to the
inner chassis.
– Replug the power cable (J1) and supervisor cable (J2) at the rear of the assembly.
– Put the circuit breaker in the On (‘1’) position.
Does the failure condition still exist?
Yes No
058
– Go to Step 030 on page 1-307.
059
–
HiPS 2.0, HiPS 3.0, or HiPS-LC8 Replace switch assembly (see "Procedures for Switch Assemblies" in
IBM RS/6000 SP: Maintenance Information, Volume 3, Locations and Service Procedures).
SPS or SPS-8 Replace inner chassis assembly (see "Procedures for Switch Assemblies" in
IBM
RS/6000 SP: Maintenance Information, Volume 3, Locations and Service Procedures).
– Go to Step 030 on page 1-307.
1-312
RS/6000 SP MAPs
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......