MAP 0530: Switch Assembly Power
Label 0 in diagram:
Single clock source must be selected for the entire switch network. Refer to
"Selecting Appropriate Switch Clocks" in
IBM RS/6000 SP: Maintenance
Information, Volume 3, Locations and Service Procedures, for additional
information.
Label 1 in diagram:
Primary node communicates with switch assembly in primary frame.
Label 2 in diagram:
Connections to secondary nodes in primary frame are checked.
Label 3 in diagram:
Any wrap plugs/terminators in primary frame are checked.
Label 4 in diagram:
Switch assembly in primary frame communicates with switch assemblies in
secondary frame(s) (if present).
Label 5 in diagram:
Connections to secondary nodes in secondary frame are checked.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-321
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......