![IBM RS/6000 SP Maintenance Information Download Page 49](http://html2.mh-extra.com/html/ibm/rs-6000-sp/rs-6000-sp_maintenance-information_3502216049.webp)
MAP 0120: Supervisor Bus Problem
052 (continued)
– Replace SEPBU power chassis (refer to "FRU Removals and Replacements" in
IBM RS/6000 SP:
Maintenance Information, Volume 3, Locations and Service Procedures).
– Reconnect ac power to frame.
– Go to Step 053 to verify fix.
053
– Perform "Verification Test for Supervisor Bus" in
IBM RS/6000 SP: Maintenance Information, Volume 3,
Locations and Service Procedures.
Did this verification test pass?
Yes No
054
– Go to “MAP 0120: Supervisor Bus Problem” on page 1-19, or “MAP 0110: Supervisor
Subsystem” on page 1-10, as appropriate.
055
Problem resolved.
– Put main power switch at front of frame in the On (‘1’) position.
– Go to “MAP 0570: End of Call” on page 1-357.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-29
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......