MAP 0140: Thin Node/Thin Node 2 Environment
018
Component replaced or reseated.
– Make sure that all cables and components are connected inside the processor node.
– Remove processor node from service position.
– Reconnect all cables at rear of the processor node.
– Put circuit breaker at the front of processor node in the On (‘1’) position.
– Check the Environmental (yellow) LED for an ON or FLASHING condition.
Is the Environmental (yellow) LED ON or FLASHING?
Yes No
019
Problem resolved.
– Go to “MAP 0570: End of Call” on page 1-357.
020
– Put circuit breaker at the front of the processor node in the Off (‘0’) position.
– Go to Step 017 on page 1-52 to service next highest priority component.
021
Priority
Component
Action
1
Fan 1, 2, or 3
1. Check specified fan for blockage or loose cable
connection.
2. Fix any obvious problem(s). If none are found,
continue at Priority 2.
3. Continue at Step 018 on page 1-53.
2
Fan 1, 2, or 3
1. Replace fan as described in "FRU Removals and
Replacements" in
IBM RS/6000 SP: Maintenance
Information, Volume 3, Locations and Service Pro-
cedures.
2. Continue at Step 018 on page 1-53.
3
Node supervisor card
1. Replace card.
2. Continue at Step 018 on page 1-53.
4
Node supervisor control cable
1. Replace cable. Refer to Figure 1-14 on
page 1-54, for cable connections.
2. Continue at Step 018 on page 1-53.
5
All replaced
Call next level of support.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-53
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......