![IBM RS/6000 SP Maintenance Information Download Page 209](http://html2.mh-extra.com/html/ibm/rs-6000-sp/rs-6000-sp_maintenance-information_3502216209.webp)
MAP 0320: 332 MHz SMP Node Minimum Configuration
019 (continued)
Component is working correctly.
– Go to Step 016 on page 1-188 to add another component. If all components have been installed,
go to “MAP 0570: End of Call” on page 1-357.
020
Component is working correctly.
– Go to Step 016 on page 1-188 to add another component. If all components have been installed, go to
“MAP 0570: End of Call” on page 1-357.
021
Run minimum configuration on the wide node (minimum configured I/O expansion chassis and a thin node
that IPLs correctly).
– Replace the I/O expansion control cable and IPL the node.
Does the IPL fail?
Yes No
022
Add components (removed in Step 005 on page 1-186), one at a time, in the following order and
IPL the node:
PCI adapters (one at a time), if applicable
Reconnect the DASD cable (4-drop) to the front of the I/O expansion assembly DASD.
DASD (one at a time), if applicable.
Did the node IPL properly?
Yes No
023
Component failed.
– Replace failed component and IPL.
Did node IPL properly?
Yes No
024
Component failed.
– Replace failed component.
– Go to Step 023.
025
– Go to Step 022.
026
Component working correctly.
– Go to Step 022.
– If all components are installed, go to “MAP 0570: End of Call” on page 1-357.
027
(Step 027 continues)
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-189
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......