MAP 0500: Ethernet LAN
011 (continued)
– Go to “MAP 0570: End of Call” on page 1-357.
012
Problem affecting an individual thin processor node’s integrated Ethernet connection.
– Open the rear cover of the RS/6000 SP frame, and locate the proper processor node.
– Use the following table to reseat or replace components.
Priority
Component
Action
1
T-adaptor (coax) or TTP transceiver
(N00-BH-J5)
1. Check the connection at the T-adaptor (coax) or
TTP transceiver on the integrated Ethernet card
(N00-BH-J5), and tighten as necessary. For TTP,
also check cable and connection at the TTP HUB,
and verify correct plug position.
2. Verify that internal and external cables are con-
nected to the correct integrated or Micro Channel
Ethernet card, respectively.
3. If no problem was found continue at Priority 2; oth-
erwise, verify fix at Step 016 on page 1-292.
2
T-adaptor (coax) or TTP transceiver
(N00-BH-J5)
Replace component. If no problem is found, go to Pri-
ority 3.
3
(Planar power problem)
1. From the control workstation, reset this processor
node.
2. Check 3-digit LEDs for any non-blank condition
during IPL.
3. If the 3-digit LEDs are always blank, go to Step 006
on page 1-51 to fix the planar power problem. Oth-
erwise, continue at Priority 4.
4
Ethernet riser card
1. Put circuit breaker(s) at front of processor node in
the Off (‘0’) position, then remove processor node
from frame.
2. Remove processor node cover.
3. If a 332 MHz SMP or POWER3 SMP node, go to
Priority 5. If other node, continue with next step.
4. Replace the integrated Ethernet riser card.
5. Continue at Step 013.
5
I/O planar card
1. Replace the I/O planar card. Make sure that all
cards and cables are reinstalled properly following
replacement.
2. Continue at Step 013.
6
All replaced
Call next level of support.
013
Component reseated or replaced.
– Reinstall processor node top cover.
– Reinstall processor node in frame. Make sure to reconnect cables at back of processor node.
– Put circuit breaker(s) at the front of processor node in the On (‘1’) position.
– Go to Step 016 on page 1-292 to verify fix.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-291
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......