MAP 0540: Switch Function
Table
1-11 (Page 2 of 3). HiPS Error Conditions
Error #
Message/Condition
Description and Action
−
7
(HiPS)
Service phase worm dialog
time-out
Description: Switch cannot contact fault_service daemon on
processor node. Processor node may be hung or fault_service
daemon not active.
Action:
1. Have customer verify that the processor node is active
and that the correct switch software (fault_service
daemon) is active on this node. Example: Log into
processor node and enter:
ps -ef | grep fault
2. If you get no result, the fault_service daemon is not
active. Contact next level of support, if necessary.
−
8
(HiPS)
frame.slot mismatch (possible
miswire)
Description: Initialization of this link detected a different switch
node number than the one expected.
Action:
1. Check this connection against the actual hardware
cabling.
2. If the cabling does not match, correct the cabling
problem, then go to step 5.
3. Check the processor node's hostname and switch node
number against the configuration using the command:
splstdata -s | pg
4. If this occurs on all nodes of a frame, check for a logical-
to-physical frame number mismatch.
5. Have the customer update the configuration, or you can
correct the cabling, as appropriate.
6. Go to Step 008 on page 1-329.
−
9
(HiPS)
Software scan of switch element
failed
Description: Probable hardware problem.
Action: Go to Step 008 on page 1-329.
−
10
through
−
15
(HiPS)
Switch ... RAM failed diagnostics
Description: Probable hardware problem.
Action: Go to Step 008 on page 1-329.
−
16
(HiPS)
Device may not be driven by the
global oscillator (may be driven
by internal clock)
Description: Initialization of this link failed due to possible
clock synchronization problem.
Action: Go to Step 008 on page 1-329.
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-325
Summary of Contents for RS/6000 SP
Page 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 2: ......
Page 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Page 8: ...vi RS 6000 SP MAPs...
Page 10: ...viii RS 6000 SP MAPs...
Page 16: ...xiv RS 6000 SP MAPs...
Page 20: ...xviii RS 6000 SP MAPs...
Page 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Page 383: ......
Page 387: ......