Figure 3-27
Unpacking the half-width compute node
4.
Take out the half-width compute node in its ESD bag and place it on the ESD floor.
NO TICE
Take a compute node out of its ESD bag only before you install it immediately.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
66