Step 2
Power off the compute nodes. For details, see their user guides.
Step 3
Disconnect the chassis power cables from the external power supply to power off the chassis.
----End
E9000 Server
User Guide
4 Powering On and Off
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
90