Figure 3-7
Removing a management module
2.
Completely open the ejector lever on the management module. See (2) in
3.
Horizontally pull out the management module from the chassis. See (3) in
4.
Close the ejector lever on the management module. See (4) in
.
NO TICE
Ensure that an ESD bag holds only one management module.
5.
Place the removed management module into an ESD bag.
6.
to remove the other management module (if there are two
management modules).
Step 5
Remove PSUs. The procedure for removing a DC PSU is the same as that for removing an
AC PSU.
1.
Press the latch on the PSU. See (1) in
.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
52