Figure 6-10
Removing the partition board
b.
Press the ejector release buttons on the full-width compute node. See (1) in
.
Figure 6-11
Installing a full-width compute node
c.
Completely open the ejector levers on the full-width compute node. See (2) in
d.
Horizontally insert the full-width compute node into the chassis. See (3) in
.
E9000 Server
User Guide
6 Parts Replacement
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
109